The roof is on at last, but it did not beat the snow. The scrap pile from the mill looks to be as high as the staff bunkhouse. The two large septic tanks can be seen beside the bunkhouse, at the left of the picture. There will not be time to cover the roof overhangs. That will have to come next year.
0 Comments:
Post a Comment
<< Home